The greens at Silver Creek were constructed in accordance to the USGA recommendations. The South greens were built in 1992, the North in 1997 and the West in 2004. The green is built in a series of layers which provides optimal growing and drainage properties. The following is a brief description of each layer of a green. Subgrade The green site is dug down approximately 16” down to a clay base. The clay base is shaped to conform to the slope of the finished grade of the…